Start from the volume, not the wall

A statement work is judged against the whole room: ceiling height, circulation, sightlines and the position of the first view. Architects usually fix the point where the work must be read, then work backwards to scale and depth. A work chosen for an empty wall often looks smaller or heavier once furniture and people are in the room.

Material and light decide the result

Finish, relief and colour change with the light. A matt surface under raking light shows its depth; the same surface under flat light can look quiet. Ask when the room is used, which artificial light is planned and whether the work should be strongest by day or in the evening.

Fix the technical points early

Weight, fixing, access for delivery and maintenance belong in the project schedule. A work that arrives late, or that cannot pass through a door, becomes a compromise. Send plans and the delivery route to the Studio at the start and the answers can be written into the specification.

Frequently asked questions

What should an architect send to the Studio first?

A plan, a wall elevation, photographs of the space, the intended installation date and the delivery route.

Can an artwork be chosen before the finishes are fixed?

Yes, and it often helps. The palette of the work can then guide the finishes, as long as dimensions and timing are agreed early.